top of page

Service Areas

We have been responsible for a complete range of services :
Material Supplier

We capable to supply various products of building material such as light-weight steel [trusses]; Canal C and Topspan/ Roof batten, heavy-weight steel ; H-Beam and IWF Beam, Pre-fab steel, floordek, roofing -walling in various brands; metal corrugated such as spandek, trimdek, kliplok, v-crimp, ecoroof - polymer composite roof, bitumen roof, metal tile roof, gypsum board, Aluminium Composite Panel, etc.

 

 

Building Contractor

Our experience since 2006 as Building Contractors has many compliment and award.

 

To every building project we bring the professional and technical staff resources and experience to provide creative, innovative and practical solutions to meet the technical and environmental challenges.

 

Our engineers possess extensive expertise in building design from initial planning to erection supervision to meet the project requirements.

Management Construction

In line with our experience as Building Contractor, a good management construction application determines PCKB  is getting exist.

 

As we known, the selection of construction methods is of crucial importance for the economical & timely completion of building therefore we are actively participating in research and development of materials, new technology and methods of analysis in order to develop our core competencies.

Pre-Eliminary Study

 

Cost is the fundamental component for any building construction project. However, cost overrun is observed as one of the most frequently occurring issues in building construction projects worldwide and need to be studied more to alleviate this issue in the future.

 

This trend is more severe in developing countries where these overruns sometimes exceeds 100% of the anticipated cost of the project. Like other countries, construction industry in Indonesia is also facing a lot of challenges such as the delay to complete the project in time, the expenditure exceeding the budget, the building defects and over dependent of foreign workers. The ultimate effects of project delay also results in exceeding cost.

Building
Supervisor Consultant

 

The poor design & delays in Design, unrealistic contract duration & requirements imposed, lack of experience, late delivery of materials & equipment, relationship between management & labour, delay preparation & approval of drawings, inadequate planning & scheduling, poor site management & supervision and mistakes during construction were most common and significant factors causing cost overrun in Indonesia, therefore PCKB provides experts.

 

Telephone
0821 8877 6999
bottom of page